A demonstration site — this company, its crews and its customers are not real.
A wet residential street after rain, puddles in the gutter, small capes and colonials with short front lawns along one side and a young street tree at the curb.

How the work is done

A route day, not a time

Your crew comes on the same weekday every week. Rain moves the visit along that week, Saturday at the latest, and a visit that can't be made is not invoiced.

AI-generated illustration. Not a real home or business.

Why your street is on one weekday

A day, not a time. A season plan has a route day, not a time. Your crew comes on that weekday every week, at some point in the working day, and you don't need to be home: leave the gate unlocked and the dog inside.

A crew's time goes either on lawns or on the road. When every house on a street is on the same weekday, the crew walks from one yard to the next instead of driving. Rafferty puts neighbors on the same route day, so a crew parks once for three lawns.

So a route day is chosen for the street, not for the house, out of Monday, Tuesday, Wednesday, Thursday and Friday. Rafferty sets the routes, and the agreement names your day before you sign.

Priced by the minute. A weekly visit is priced by the minutes it takes a crew of two on your lot, plus ten minutes for the drive to the next stop, which is why neighbors on one street are on one route.

What a crew's day holds

A crew of two, 8 am to 4:30 pm, and the same order at every stop.

  1. The yard, first thing

    The day starts at 8 am at the yard on Denton Avenue, where the trucks and the trailers are kept. The day's stops are in route order, so a crew drives from one lawn to the next on the same few streets.

  2. The fence line and the beds

    Kwabena trims the fence line before the mower comes through, so nothing gets thrown. The string trimmer goes round the fence, the posts, the mailbox and the edge of every bed.

  3. The mower

    Clippings stay on the lawn, mulched fine by the mower: they return nitrogen to the soil and never go in a bag. A lawn cut at the same height each week stays thick, and a thick lawn leaves little room for weeds.

  4. The edges

    On a corner lot Desmond starts at the curb, because that's the edge everybody sees. After the first cut of the season the edger follows the same line each week, so the edge stays straight rather than creeping into the lawn.

  5. The walks, the steps and the driveway

    Blown clear, so nothing the visit cut is left on a hard surface. Lucía leaves every gate the way she found it, latched.

  6. The next stop

    Ten minutes are held on the crew's day after every visit for the drive. The day ends at 4:30 pm.

A weekday on a route is eight and a half hours long. A weekly visit to a lot of 6,000 square feet takes the crew eighteen minutes on the lot, and ten more are held for the drive, so a day of nothing but lots like that one would hold eighteen visits. Real days mix small lots and corner lots, clean-ups and feeding rounds, which is why a route is planned in minutes and not in stops, and why the price of your visit is the minutes your lot takes. Price your lot.

When it rains

Wet grass is not mowed.

When it rains. Wet grass tears and ruts, so a rained-out day moves to the next working day of the same week, Saturday at the latest. A visit we can't make by Saturday is skipped and not invoiced. A route day that falls on a holiday moves the same way.

A mower on wet grass tears the blades instead of cutting them, leaves the clippings in wet clumps that smother the lawn underneath, and presses ruts into soft ground that last for weeks. On a slope it slides. A visit made on a wet morning does the lawn more harm than a visit made a day late.

On a wet morning Noor is the one who moves the day's route to the next dry day and tells every customer on it.

A wet Tuesday, day by day

A route on Tuesdays, in a week when the rain doesn't stop.

  • Tuesday

    Your route day. Too wet in the morning, so the visit waits.

  • Wednesday

    The next working day. If the lawn has dried, the visit is made today.

  • Thursday

    Still the same week, so the visit can still be made, as soon as the lawn is dry.

  • Friday

    Still the same week, so the visit can still be made, as soon as the lawn is dry.

  • Saturday

    The rain day. If the visit can be made, it is made today, between 10 am and 4 pm. If it can't, it is skipped and not invoiced, and next week's visit is on your route day as usual.

Holidays

The office and the lawn and garden crews don't work on Sundays, or on New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and the day after, or Christmas Day. Only a snow route runs on those days.

A route day that falls on one of those moves the way a rained-out day does. In 2027, Memorial Day falls on Monday, May 31, so that week's Monday visits are made on Tuesday, June 1.

Weekdays, and a rain day. The crews work Monday to Friday, 8 am to 4:30 pm, and keep Saturday, 10 am to 4 pm, for the visits a rained-out day moved. No lawn or garden work is done on a Sunday or a holiday; a snow route runs whenever the snow falls.

Skipping a week

Skip a week. Away for a week, or the lawn doesn't need it in a dry August? Skip that week's visit from its own page until 6 pm the evening before. A skipped visit is not invoiced, and the rest of the season stays as it was.

Each visit has its own page, from the link in your e-mail, and that is where a week is skipped. Nobody has to telephone and nobody has to explain. The rest of the season stays dated exactly as the agreement has it. Season plans.

Start with an estimate visit

Book an estimate visit, at least twenty-four hours ahead. There's no charge for it, and nothing has to follow it.