
The lot-size estimator
What a weekly visit costs for your lot
Both ends of the price for your lot's band, how that price is built, and how to measure the lot yourself before anyone visits.
AI-generated illustration. Not a real home or business.
Give the lot's width and depth in feet, or its size in square feet, and the prices appear here.
The estimator on this site prices lots from 1,000 square feet to 25,000 square feet. A larger lot, and an association's or a business's grounds, are priced at the estimate visit.
The estimator gives the price for the band your lot is in, both ends. The estimate visit measures the lot and puts the price for the lot as measured on the agreement.
Every price here is before sales tax, which is added to each invoice as its own line at the rate where the work is done: 8.625% in Nassau County and 8.875% in Queens. In New York, mowing, clean-ups, feeding, sprinkler visits and snow removal are taxed as services to a property.
Every job starts with an estimate visit. There's no charge for it, and you don't have to book anything after it.
The rate card, band by band
The same figures the estimator shows, for a browser without JavaScript, or for setting one band beside the next.
| The lot | A weekly visit | On site, a crew of two |
|---|---|---|
| 1,000 to 3,000 square feet | $45 to $55 | about ten to fifteen minutes |
| 3,000 to 4,500 square feet | $50 to $60 | about thirteen to eighteen minutes |
| 4,500 to 6,000 square feet | $55 to $65 | about sixteen to twenty minutes |
| 6,000 to 8,000 square feet | $60 to $75 | about eighteen to twenty-four minutes |
| 8,000 to 10,000 square feet | $65 to $80 | about twenty-one to twenty-seven minutes |
| 10,000 to 13,000 square feet | $75 to $90 | about twenty-four to thirty-two minutes |
| 13,000 to 16,000 square feet | $85 to $105 | about twenty-nine to thirty-eight minutes |
| 16,000 to 20,000 square feet | $95 to $115 | about thirty-four to forty-four minutes |
| 20,000 to 25,000 square feet | $110 to $135 | about forty to fifty-three minutes |
Bigger grounds. The estimator on this site prices lots from 1,000 square feet to 25,000 square feet. A larger lot, and an association's or a business's grounds, are priced at the estimate visit.
How the price is built
A weekly visit is priced from the lot: eight minutes, plus a minute and six-tenths for every thousand square feet, counted up to the whole minute, for a crew of two, and ten minutes for the drive to the next stop, at $130 a crew-hour, rounded to the nearest five dollars and never under $45. A corner lot, with twice the edging, takes a tenth longer.
The range in each band has two ends because a band covers a span of lot sizes, and because a corner lot takes longer than a straight one of the same size. The estimate visit measures your lot, and the agreement carries one price for it.
Priced by the minute. A weekly visit is priced by the minutes it takes a crew of two on your lot, plus ten minutes for the drive to the next stop, which is why neighbors on one street are on one route.
Tax is its own line. Every price here is before sales tax, which is added to each invoice as its own line at the rate where the work is done: 8.625% in Nassau County and 8.875% in Queens. In New York, mowing, clean-ups, feeding, sprinkler visits and snow removal are taxed as services to a property.
How to measure your lot
Any one of these is close enough for the estimator. The estimate visit measures it again with a wheel.
The survey
The survey from your closing draws the lot with its measurements on every side. It is the most accurate figure most owners have, and it is often in the folder with the deed.
The tax map
Nassau County and New York City both keep tax maps that draw every lot with its frontage and its depth; the block and lot number on your property tax bill finds yours on it.
A tape along the front
Measure the frontage along the curb and the depth down one side, and multiply: a lot 50 feet along the street and 100 feet deep is 5,000 square feet. Measure the whole lot, house and driveway included, because the rate card is built on the lot.
Why a corner lot takes longer
A corner lot, with twice the edging, takes a tenth longer.
A lot in the middle of a block has one curb, one walk and one driveway apron to edge. A corner lot has a second street side: another run of curb, often a second public sidewalk, and the hydrant, the signpost and the light pole that stand at a corner, each one trimmed around.
Desmond Achterberg-Ruiz, who leads the first crew, starts a corner lot at the curb for the same reason the edging matters at all: it is the edge everybody sees.
Start with an estimate visit
Book an estimate visit, at least twenty-four hours ahead. There's no charge for it, and nothing has to follow it.